Unsurprisingly, it took me literally all day to get the network closet back up and running! But this time it is much more neatly organized.
I added a 12-port patch panel in the corner that all the building runs terminate into. Half of these were from the 2019 studio buildout, the other half I've added over the years, with pretty messy cable runs through the space. Now they are all neatly tucked inside the wall and terminated into this patch panel!
I then started rebuilding the rack, and made custom length cables for the 12 connections. One end is an rj45 jack, the other end is a keystone connector for the rack patch panel.
By the end of the day I was able to get all the gear back in the rack! I know it still looks a bit messy but believe me this is far better than it was before I started this!
WeChat ID
aaronpk_tv