WeChat ID
aaronpk_tv
Today I had a crew come and replace the water heater! The old one was from 2008, and apparently at the end of its expected lifetime. Rather than wait until it blew up and turned into an emergency, I had it replaced.
The new one is a heat pump water heater! And since it's in the same room as my servers, it acts as an air conditioner for the space too! It will always have an abundant supply of warm air from the servers in the room, and I will always be happy to have it cool the space down.
This week's CSA
Doing the very important work of testing if the slushie machine works on the battery and how long it will last in prep for the Grilled by Bike ride this weekend
Wired up the low voltage box by the electrical panel!
Finished all the coax connections!
Finished the network closet and got the new switches up and running!
I'm testing some fruit leather recipes. The only fruit is apples, and I added some sour apple flavoring and citric acid.
The one on the left is just apples and flavoring.
The middle one I added vegetable glycerin. It thickens it up a lot, it's still leathery but has more heft to it. It's also a little easier to chew.
The one on the right has vegetable glycerin as well as pea protein powder. The pea protein gives it some real substance, and also turns it from leathery to more like a jelly candy. I wouldn't describe it as fruit leather, but it's a really good snack still.
look how official! Now we have a wired fire alarm system!
This week's CSA
the cats think this is the best game
got a sneak peek of the first edit of my video tonight
wired up the water meters today! Unfortunately I can't actually test them because there's no power in the water room yet.
Checked off a bunch of things on the list today!
• Wired and mounted rooftop patio speakers and microphone
• Wired and mounted living room and kitchen speakers
• Set up the Sonos amps
• Hung some more rack gear in the network closet
📍 Fremont Bridge
📍 Marquam Bridge
📍 Marquam Bridge
Bridge Pedal!
Setting up the streaming rig for the Bridge Pedal tomorrow
Made some good progress on the wiring for the network closet!
The plumber finished installing the meters and hooking up the fire sprinklers!
I filled up some pitchers and pots of water since I knew the plumer would be disconnecting the water today and it did pay off, I was able to make lunch despite there being no running water in the house most of the day.
We *finally* got a crew willing to bring the fridge upstairs!
The plumber came to work on the final plumbing for the water room!
📍 Alaska Lounge
📍 Salesforce Transit Center
This week's CSA haul
and now it's my turn in front of the camera!
